13 Jun 2026 05:05 → 14 Jun 2026 05:05 AEST
| Capex total (greenfield) |
—
How this was derived |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
$358,607
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
$25,615
Shown in table Reported / source value |
| Variable OPEX / MWh |
$1.54
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026
Notes
No plant-specific reported battery capex was found. Public sources for Harlin Solar Pty Ltd / Harlin SF describe a greenfield solar farm JV with a battery marked TBD, and construction was expected to commence in 2024; however, no verified battery construction cost or online date was located. AEMO/CSIRO GenCost 2024-25 indicates large-scale battery costs fell 20% in 2024-25, but the report excerpt available here does not provide a project-specific capex figure. Default operating assumptions were retained from the provided internal fallback only where no site-specific data was found.