BESS · Elements Green Australia Pty Ltd · Storage - Battery
14 Jun 2026 00:00 → 14 Jun 2026 23:59 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage default |
$350,000
Shown in table |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
$26,371
Shown in table Reported / source value |
| Variable OPEX / MWh |
$1.58
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: unknown · AI checked 08 Jun 2026
Notes
No reliable project-specific greenfield capex announcement was found for Halys Hybrid Facility - BESS from the owner/developer or government sources in the searched results. Search results indicate the Halys BESS is associated with Elements Green / later references to Akaysha and that the project is very large (sources mention up to 500MW/2000MWh, 400MW/1600MWh, 1000MW/2000MWh, and even >3GWh), but these capacity figures conflict and could refer to different proposal stages or related assets. Because no plant-specific investment figure was found, server-side fallback capex was used as instructed. OPEX defaults were also used as fallbacks; no plant-specific O&M benchmark was verified in the retrieved sources.