BESS · X-Elio Australia Pty Ltd · Storage - Battery
13 Jun 2026 00:00 → 13 Jun 2026 23:59 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
$358,607
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
$16,393
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh default |
$1.50
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 04 Jun 2026
Notes
No plant-specific greenfield capex announcement was found for Halys BESS / South Burnett BESS. X-Elio’s project page identifies the asset as a 300 MW four-hour lithium-ion battery connected to the Powerlink Halys substation, with construction expected to start mid-2026 and operations targeted for end-2027. AEMO draft 2025 technology review provides a 4-hour large-scale lithium-ion BESS fixed O&M benchmark of AUD 16,000/MW/year and a 20-year design/technical life. Because the project-specific capex was not located, capex fields remain unfilled rather than using a benchmark as reported capex.