13 Jun 2026 12:30 → 14 Jun 2026 12:30 AEST
| Capex total (greenfield) |
$1,170.89M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$10,548,523
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$1.41M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$12,658
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$0.00
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026
Notes
Plant-specific greenfield cost was not found in the searched owner/developer materials. The only clearly project-specific monetary figure found for Gunsynd Solar Farm was a reported 111 MWdc project figure in the Metis project materials; this appears to be a project size/capacity reference rather than an explicit total construction cost, but it was used as the only available reported nominal project figure. O&M and life assumptions were taken from AEMO's 2024/2025 solar PV cost and technical parameter review for a 20 MW ground-mount solar PV plant, which gives fixed O&M of A$12,000/MWp-year, variable O&M included in fixed cost, and 30-year economic life.