BESS · Canadian Solar · Storage - Battery
12 Jun 2026 00:00 → 12 Jun 2026 23:59 AEST
| Capex total (greenfield) |
$686.71M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
—
|
| Fixed OPEX (annual) |
$3.96M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$26,371
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$1.58
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026
Notes
Project approval/reporting indicates a 250 MW solar farm with a 150 MW, four-hour battery energy storage system; total project cost reported as $651 million (AUD nominal, 2024). No project-specific battery-only capex disclosure was found in the available search results, so the total project cost is used as the best available reported greenfield figure for the battery site record. Capacity in MW/MWh was inferred from the project approval report.