Gunning Solar Farm (Canadian)

BESS · Canadian Solar · Storage - Battery

Development AEMO: Publicly Announced Other - Other NEM data · 7h
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$1.58/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates

DUID
Owner Canadian Solar
Commissioned
Expected closure
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM
Battery platform / chemistry
Inverter OEM
Inverter / PCS model
Stats window
14 Jun 2026 00:00 → 14 Jun 2026 07:25 AEST

Dispatch & revenue

14 Jun 2026 00:00 → 14 Jun 2026 07:25 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.58/MWh
Capex total (greenfield)
$686.71M

Shown in table
$686.71M (2026 real AUD)

Reported / source value
$651.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Reported total project cost for the approved Gunning project.

Reference
Canadian Solar lands NSW approval for 250 MW solar farm and 600 MWh battery (high confidence)
Source recorded 08 Jun 2026

Capex refurbishment
Capex / MWh storage
Fixed OPEX (annual)
$3.96M

Shown in table
$3.96M (2026 real AUD)

Reported / source value
$3.75M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$26,371

Shown in table
$26.4k (2026 real AUD)

Reported / source value
$25.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Source supports that AEMO/Aurecon provides BESS fixed O&M parameter ranges; the specific value here is the server-side fallback provided by the user, not a project-specific reported figure.

Reference
2024 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 08 Jun 2026

Variable OPEX / MWh
$1.58

Shown in table
$1.58 (2026 real AUD)

Reported / source value
$1.50 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
BESS variable O&M is not specified in the AEMO/Aurecon table; the value used is the server-side fallback provided by the user.

Reference
2024 Energy Technology Cost and Technical Parameter Review (low confidence)
Source recorded 08 Jun 2026

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026

Notes
Project approval/reporting indicates a 250 MW solar farm with a 150 MW, four-hour battery energy storage system; total project cost reported as $651 million (AUD nominal, 2024). No project-specific battery-only capex disclosure was found in the available search results, so the total project cost is used as the best available reported greenfield figure for the battery site record. Capacity in MW/MWh was inferred from the project approval report.