Gunnedah Solar Farm (GNNDHSF1)

Solar · Gunnedah SF Pty Ltd atf Gunnedah Asset Trust · Solar PV - Single axis tracking

Operational AEMO: In Service NSW1 Solar - Solar NEM data · 24 hours
110 MW
Registered nameplate capacity
24 hours revenue
$35.1k
Capacity factor
27.4%
Revenue / MWh
$48.48
Est. SRMC
$0.33/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.

Key information
Capacity
110 MW

AEMO status In Service
Project status Operational (AI)

PCL Construction project page (2021): project completed and site referenced as already operational/commissioned after construction; AEMO registration shows In Service.

Region NSW1
Coordinates -30.99080, 150.09960 (AI)

Ironbark Energy project/location page: located 4.5km west of Gunnedah, off the Oxley Highway, northern NSW; approximate site coordinates inferred from project location.

MLF 0.8463
DUID GNNDHSF1
Owner Gunnedah SF Pty Ltd atf Gunnedah Asset Trust
Commissioned Oct 2021
Expected closure 2056
Closure date —
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM Canadian Solar
Module / inverter supplier modules and trackers
Inverter OEM Ingeteam
Inverter model CON40
Equipment confidence high
Stats window
25 Sep 2026 00:00 → 25 Sep 2026 23:59 AEST

Dispatch & revenue

25 Sep 2026 00:00 → 25 Sep 2026 23:59 AEST

Energy revenue (× MLF)
$35.1k
FCAS revenue (× MLF)
$0
FCAS volume
— MWh
Dispatched
724.4 MWh
Available
1,097.7 MWh
Curtailed
373.3 MWh
Curtailment
34.0%
of available
MLF used
0.8463
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional price — dispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • State of charge — INITIAL_ENERGY_STORAGE (MWh at interval start) from UNIT_SOLUTION, published for bidirectional/storage units. Next-day data — the SOC line lags real time by up to a day.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.8394
2025-07-01 0.8437
2026-07-01 0.8463

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
110 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.33/MWh
Capex total (greenfield)
$261.20M

Shown in table
$261.20M (2026 real AUD)

Reported / source value
$200.60M (2019 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Project-specific greenfield construction/investment cost for Gunnedah Solar Farm.

Reference
Gunnedah Solar Farm EIS (high confidence)
Source recorded 08 Jun 2026

Capex refurbishment
—
Capex / MW derived
$2,374,527

Shown in table
$2.37M (2026 real AUD)

Reported / source value
$1.82M (2019 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$2.86M

Shown in table
$2.86M (2026 real AUD)

Reported / source value
$2.20M (2019 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$26,042

Shown in table
$26.0k (2026 real AUD)

Reported / source value
$20.0k (2019 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Used only as fallback context; exact solar PV fixed O&M value was not cleanly extracted from accessible lines, so server-side default was retained.

Reference
2024 Energy Technology Cost and Technical Parameter Review (low confidence)
Source recorded 08 Jun 2026

Variable OPEX / MWh
$0.33

Shown in table
$0.33 (2026 real AUD)

Reported / source value
$0.25 (2019 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No project-specific variable O&M located; retained default fallback.

Fuel cost / GJ
—
Heat rate GJ/MWh
—

Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026

Notes
Project-specific greenfield capital investment value of A$200.6 million was reported in the EIS for the Gunnedah Solar Farm. The plant is a 110 MWac single-axis tracking solar PV facility. Fixed O&M and variable O&M were not found as project-specific values, so server-side defaults were used only for O&M fallback. No refurbishment capex identified.

Sources