Gunnedah East BESS (Green Leap) - KCI

BESS · Green Leap P/L · Storage - Battery

Development AEMO: Publicly Announced Other - Other NEM data · 24 hours
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$1.58/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates

DUID
Owner Green Leap P/L
Commissioned
Expected closure
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM
Battery platform / chemistry
Inverter OEM
Inverter / PCS model
Stats window
13 Jun 2026 04:05 → 14 Jun 2026 04:05 AEST

Dispatch & revenue

13 Jun 2026 04:05 → 14 Jun 2026 04:05 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.58/MWh
Capex total (greenfield)
Capex refurbishment
Capex / MWh storage
$369,198

Shown in table
$369.2k (2026 real AUD)

Reported / source value
$350.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$2.78M

Shown in table
$2.78M (2026 real AUD)

Reported / source value
$2.64M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Annual fixed O&M was scaled to the project capacity using the benchmark per-MW figure.

Reference
2024 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 08 Jun 2026

Fixed OPEX / MW-yr
$23,207

Shown in table
$23.2k (2026 real AUD)

Reported / source value
$22.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
For the 1-hour BESS case, AEMO/Aurecon shows fixed O&M of 5,400 and extended warranties of 3,600 per MW-year, totaling 9,000 per MW-year.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 08 Jun 2026

Variable OPEX / MWh
$1.58

Shown in table
$1.58 (2026 real AUD)

Reported / source value
$1.50 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
The benchmark shows no separate variable O&M for BESS; user-supplied default of AUD 1.50/MWh retained in profile because no plant-specific value was found.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 08 Jun 2026

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026

Notes
Project-specific greenfield capex could not be located in owner, government, or planning sources. Planning documents identify the project as approximately 120 MW / 480 MWh. Fixed O&M is estimated from AEMO/Aurecon 2024 BESS benchmark of AUD 5,400/MW-year fixed O&M plus AUD 3,600/MW-year extended warranties (total AUD 9,000/MW-year), not a reported plant-specific value; annual fixed O&M shown is scaled to 120 MW. Battery design life benchmarked at 20 years; no fuel/heat-rate assumptions apply.

Sources