BESS · Gunnedah Battery Subco Pty Ltd · Storage - Battery
13 Jun 2026 09:20 → 14 Jun 2026 09:20 AEST
| Capex total (greenfield) |
—
How this was derived |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
$369,198
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$25,000
Shown in table How this was derived Reference |
| Variable OPEX / MWh |
$0.00
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026
Notes
I found a Recurrent Energy project page for Gunnedah BESS showing project capacity of 280 MWh, but no plant-specific greenfield investment/capex figure was located in the available sources. Because the prompt required plant-specific capex before falling back to benchmarks, capex is left blank rather than inferred from AEMO/CSIRO. For battery O&M, AEMO/Aurecon 2024 provides indicative fixed O&M of $5,400/MW-year for a 1-hour BESS and states variable O&M is typically not used for BESS long-term service agreements; extended warranty can add $3,600/MW-year for 20-year LFP batteries. A 20-year battery life is used as a technical default from the same source. No refurbishment cost identified.