| Capex total (greenfield) |
—
How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
$369,198
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
How this was derived Reference |
| Fixed OPEX / MW-yr default |
$25,000
Shown in table |
| Variable OPEX / MWh default |
$1.50
Shown in table How this was derived Reference |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026
Notes
Public web search found the Gullen BESS project page indicating a proposed standalone battery energy storage system of up to 300MW/600MWh co-located with Gullen Range Wind Farm, but no reliable project-specific total construction/investment cost announcement was located. Because no plant-specific capex or operating cost figures were verified, internal fallback values were not applied here. The project appears to be proposed/in planning rather than a confirmed commissioned asset in the retrieved sources.