Coal · EDL Projects Australia Pty Ltd · Reciprocating Engine - Spark ignition
14 Jun 2026 13:25 → 15 Jun 2026 13:25 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$2,109,705
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$40,000
Shown in table |
| Variable OPEX / MWh default |
$2.00
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 06 Jun 2026
Notes
Grosvenor 2 was commissioned in 2017 as part of the Grosvenor waste coal mine gas project; however, no official or sufficiently reliable source located in the search provided a total project investment or plant-specific capex figure for the Grosvenor 2 expansion. AEMO/CSIRO benchmark values were not applied because the requested capex search priority did not yield a plant-specific figure in the sources found.