Solar · Greenpulse solar farm and BESS as trustee for Greenpulse Solar Farm & Bess Unit Trust · Solar PV - Fixed
16 May 2026 06:20 → 15 Jun 2026 06:20 AEST
| Capex total (greenfield) |
$185.75M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,160,338
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$18,000
Shown in table |
| Variable OPEX / MWh default |
$0.20
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 04 Jun 2026
Notes
Could not verify a plant-specific greenfield capex announcement for Greenpulse Solar Farm (KCI) from authoritative sources in the available search results. ABN Lookup confirms the trustee entity is active from 29 Jul 2024 and EPBC materials identify the proponent for the related Garoo Solar Farm and BESS proposal, but no total project investment figure was located. Because the prompt requires plant-specific capex before using benchmarks, capex has been left null. Given the lack of verified project-specific O&M and performance data, no fallback O&M values were applied.