Greenpulse BESS (KCI)

BESS · Greenpulse solar farm and BESS as trustee for Greenpulse Solar Farm & Bess Unit Trust · Storage - Battery

AEMO: removed Solar - Solar NEM data · 10h
360/720 MW
Registered nameplate capacity / storage
Est. SRMC
$0.20/MWh
Key information
Capacity
360 MW / 720 MWh

AEMO status removed
Project status (AI)

Coordinates

DUID
Owner Greenpulse solar farm and BESS as trustee for Greenpulse Solar Farm & Bess Unit Trust
Commissioned
Expected closure
Closure date
Technology Storage - Battery
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
15 Jun 2026 00:00 → 15 Jun 2026 09:55 AEST

Dispatch & revenue

15 Jun 2026 00:00 → 15 Jun 2026 09:55 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (fixed)
Capacity
360 MW / 720 MWh
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.20/MWh
Capex total (greenfield)
$418.24M

Shown in table
$418.24M (2026 real AUD)

Reported / source value
$396.50M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
Capex / MW derived
$1,160,338

Shown in table
$1.16M (2026 real AUD)

Reported / source value
$1.10M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$18,000

Shown in table
$18.0k (2026 real AUD)

Variable OPEX / MWh default
$0.20

Shown in table
$0.20 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026

Notes
No plant-specific greenfield capex announcement could be verified from the owner/developer or official project documents in the available search results. Official project documents verified the Garoo Solar Farm and BESS project as a 133.76 MW AC solar farm with a 360 MW / 1,440 MWh BESS in Garoo, NSW, but did not disclose total project capital cost. Because the user requested a solar_fixed normalised type and the project appears to be a solar-plus-storage asset, operating assumptions could not be reliably assigned from source-backed plant-specific or benchmark materials within the search results. Asset life set to a conservative default for utility solar; this is not source-verified for this project.

Sources