BESS · Greenpulse solar farm and BESS as trustee for Greenpulse Solar Farm & Bess Unit Trust · Storage - Battery
14 Jun 2026 08:25 → 15 Jun 2026 08:25 AEST
| Capex total (greenfield) |
$418.24M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,160,338
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$18,000
Shown in table |
| Variable OPEX / MWh default |
$0.20
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026
Notes
No plant-specific greenfield capex announcement could be verified from the owner/developer or official project documents in the available search results. Official project documents verified the Garoo Solar Farm and BESS project as a 133.76 MW AC solar farm with a 360 MW / 1,440 MWh BESS in Garoo, NSW, but did not disclose total project capital cost. Because the user requested a solar_fixed normalised type and the project appears to be a solar-plus-storage asset, operating assumptions could not be reliably assigned from source-backed plant-specific or benchmark materials within the search results. Asset life set to a conservative default for utility solar; this is not source-verified for this project.