BESS · Solquartz Holdings Pty Ltd · Storage - Battery
13 Jun 2026 09:20 → 14 Jun 2026 09:20 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage default |
$350,000
Shown in table |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$25,000
Shown in table |
| Variable OPEX / MWh |
$1.54
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: unknown · AI checked 04 Jun 2026
Notes
No project-specific battery capex announcement was found in the searched official owner/government sources. The only clearly identified project-level cost in the retrieved sources was the broader Project Green Poly value of $7.8 billion, which refers to the full precinct/supply-chain project and not the battery-only DUID. Battery-specific capacity/duration and construction cost for this site were not located, so server-side fallback capex was retained. AEMO benchmark battery cost references were found but not used as reported project capex.