BESS · Neoen Australia Pty Ltd · Storage - Battery
13 Jun 2026 09:20 → 14 Jun 2026 09:20 AEST
| Capex total (greenfield) |
—
How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
$369,198
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
$4,958
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh default |
$1.50
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026
Notes
Project-specific capex amount was not found in the searched owner, government, or project sources. NSW Government tender materials confirm Great Western Battery (Wallerawang) as a 330 MW / 3,500 MWh project and state the tender round secures at least $4.82 billion of investment across six awarded projects, but this is a portfolio-level figure rather than a project-specific construction cost. For operating assumptions, the battery O&M fallback uses AEMO/Aurecon large-scale BESS benchmark fixed O&M of $4,700/MW-yr (2023/24 review basis) and a 20-year asset life assumption. No refurbishment cost identified.