BESS · AE BESS 3 Pty Ltd as Trustee for AE BESS 3 Unit Trust · Storage - Battery
13 Jun 2026 00:00 → 13 Jun 2026 23:59 AEST
| Capex total (greenfield) |
$819.67M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
—
How this was derived Reference |
| Fixed OPEX (annual) |
$4.05M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$8,439
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$1.58
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026
Notes
No plant-specific owner/developer capex announcement was found. Capex is inferred from a project database listing Grahamvale Battery Energy Storage System at $800 million and paired with the project size on the developer site (480 MW / 1,920 MWh). Fixed O&M is based on AEMO/Aurecon 2024 BESS benchmark for 4-hour systems ($12,800/MW-year), but the internal fallback was used for the final profile because the benchmark lines found were on a $/MW basis and the dataset requested battery defaults unless a plant-specific O&M source is available. The project appears proposed/early-stage rather than commissioned; capacity in the user prompt was blank, so 480 MW and 1,920 MWh were taken from the developer project page.