BESS · Goulburn River Fund Pty Ltd · Storage - Battery
15 May 2026 05:15 → 14 Jun 2026 05:15 AEST
| Capex total (greenfield) |
$1,028.04M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
—
How this was derived Reference |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$25,000
Shown in table |
| Variable OPEX / MWh |
$1.75
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026
Notes
Plant-specific reported capital investment of approximately AUD 880 million was found in Lightsource bp project/EIS materials. The source describes the total project capital investment for the hybrid solar farm and BESS; battery-specific share was not separately disclosed. Capacity in the prompt was not provided, so capex per MW and per MWh are calculated on the 520 MWh battery storage figure from project documents. If a different registered storage capacity is intended, these intensity figures should be revised. No reliable plant-specific O&M or fuel data found; default variable O&M used as server-side fallback only.