Goulburn River Solar Farm And BESS

BESS · Goulburn River Fund Pty Ltd · Storage - Battery

Development AEMO: Publicly Announced Other - Other NEM data · 30 days
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$1.75/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates

DUID
Owner Goulburn River Fund Pty Ltd
Commissioned
Expected closure
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM
Battery platform / chemistry
Inverter OEM
Inverter / PCS model
Stats window
15 May 2026 05:15 → 14 Jun 2026 05:15 AEST

Dispatch & revenue

15 May 2026 05:15 → 14 Jun 2026 05:15 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.75/MWh
Capex total (greenfield)
$1,028.04M

Shown in table
$1,028.04M (2026 real AUD)

Reported / source value
$880.00M (2022 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Owner/developer project document states total capital investment of approximately AUD 880 million.

Reference
Goulburn River Solar Farm - Response to Submissions (high confidence)
Source recorded 08 Jun 2026

Capex refurbishment
Capex / MWh storage

How this was derived
Planning document provides the storage capacity used to derive intensity metrics.

Reference
GOULBURN RIVER SOLAR FARM (medium confidence)
Source recorded 08 Jun 2026

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$25,000

Shown in table
$25.0k (2026 real AUD)

Variable OPEX / MWh
$1.75

Shown in table
$1.75 (2026 real AUD)

Reported / source value
$1.50 (2022 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific variable O&M source found.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026

Notes
Plant-specific reported capital investment of approximately AUD 880 million was found in Lightsource bp project/EIS materials. The source describes the total project capital investment for the hybrid solar farm and BESS; battery-specific share was not separately disclosed. Capacity in the prompt was not provided, so capex per MW and per MWh are calculated on the 520 MWh battery storage figure from project documents. If a different registered storage capacity is intended, these intensity figures should be revised. No reliable plant-specific O&M or fuel data found; default variable O&M used as server-side fallback only.

Sources