Golden Plains Wind Farm West

Wind · Golden Plains WF2 Unit Trust · Wind Turbine - Onshore

Development AEMO: Committed Wind - Wind NEM data · 30 days
557 MW
Registered nameplate capacity
Est. SRMC
$0.53/MWh
Key information
Capacity
557 MW

AEMO status Committed
Project status Development (AI)

Coordinates

DUID
Owner Golden Plains WF2 Unit Trust
Commissioned Feb 2027
Expected closure 2057
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM
Turbine model
Stats window
15 May 2026 19:05 → 14 Jun 2026 19:05 AEST

Dispatch & revenue

15 May 2026 19:05 → 14 Jun 2026 19:05 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
557 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.53/MWh
Capex total (greenfield)
$4,219.41M

Shown in table
$4,219.41M (2026 real AUD)

Reported / source value
$4,000.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Confirms Stage 2 / West is part of the larger 1,333 MW mega-project, but does not give a West-only AUD cost.

Reference
Ingka Investments secures 15% of Stage 2 in southern hemisphere’s largest wind farm (medium confidence)
Source recorded 08 Jun 2026

Capex refurbishment
Capex / MW derived
$7,574,289

Shown in table
$7.57M (2026 real AUD)

Reported / source value
$7.18M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$32.32M

Shown in table
$32.32M (2026 real AUD)

Reported / source value
$30.69M (2024 nominal)
Table total may differ if recalculated from $/MW × registered capacity after CPI adjustment.

How this was derived
Server-side fallback default used because no plant-specific onshore wind O&M cost was found.

Fixed OPEX / MW-yr
$58,017

Shown in table
$58.0k (2026 real AUD)

Reported / source value
$55.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Variable OPEX / MWh
$0.53

Shown in table
$0.53 (2026 real AUD)

Reported / source value
$0.50 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Server-side fallback default used because no plant-specific onshore wind variable O&M cost was found.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026

Notes
Reported project cost for the full Golden Plains Wind Farm appears to be about A$4 billion, with sources describing Golden Plains as a 1,333 MW project and Stage 2/West as part of the larger development. West stage construction commenced in mid-2024 and is described as ~574 MW / 577 MW in project materials; the owner/developer sources did not provide a separate West-only capital cost, so the full-project reported cost was allocated to this site as the best available plant-level proxy. O&M values were not plant-specific, so server defaults were used for wind onshore.