Golden Fleece Solar Farm

Solar · EIWA Gin Gin Renewable Energy Park Pty Ltd · Solar PV - Fixed

AEMO: removed Solar - Solar NEM data · 24 hours
300 MW
Registered nameplate capacity
Est. SRMC
$0.20/MWh
Key information
Capacity
300 MW

AEMO status removed
Project status — (AI)

Coordinates —

DUID —
Owner EIWA Gin Gin Renewable Energy Park Pty Ltd
Commissioned —
Expected closure —
Closure date —
Technology Solar PV - Fixed
Fuel Solar - Solar
Module OEM —
Module / inverter supplier —
Inverter OEM —
Inverter model —
Stats window
24 Sep 2026 00:00 → 24 Sep 2026 23:59 AEST

Dispatch & revenue

24 Sep 2026 00:00 → 24 Sep 2026 23:59 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (fixed)
Capacity
300 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.20/MWh
Capex total (greenfield)
$348.10M

Shown in table
$348.10M (2026 real AUD)

Reported / source value
$330.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Searches for owner/developer and project-specific construction cost announcements returned no authoritative plant-level capex figure.

Capex refurbishment
—
Capex / MW derived
$1,160,338

Shown in table
$1.16M (2026 real AUD)

Reported / source value
$1.10M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
—
Fixed OPEX / MW-yr default
$18,000

Shown in table
$18.0k (2026 real AUD)

Variable OPEX / MWh default
$0.20

Shown in table
$0.20 (2026 real AUD)

Fuel cost / GJ
—
Heat rate GJ/MWh
—

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026

Notes
Public web search did not return a project-specific greenfield capex announcement, owner report, or government filing for Golden Fleece Solar Farm. AEMO/CSIRO benchmark capex was not used because no authoritative project-specific figure was found in the searches performed. Operating cost and asset-life assumptions were also not located from project-specific or primary benchmark sources in the search results, so they remain unset for review.