Solar · EIWA Gin Gin Renewable Energy Park Pty Ltd · Solar PV - Fixed
14 Jun 2026 02:20 → 15 Jun 2026 02:20 AEST
| Capex total (greenfield) |
$348.10M
Shown in table Reported / source value How this was derived |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,160,338
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$18,000
Shown in table |
| Variable OPEX / MWh default |
$0.20
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026
Notes
Public web search did not return a project-specific greenfield capex announcement, owner report, or government filing for Golden Fleece Solar Farm. AEMO/CSIRO benchmark capex was not used because no authoritative project-specific figure was found in the searches performed. Operating cost and asset-life assumptions were also not located from project-specific or primary benchmark sources in the search results, so they remain unset for review.