BESS · EIWA Gin Gin Renewable Energy Park Pty Ltd · Storage - Battery
14 Jun 2026 00:15 → 15 Jun 2026 00:15 AEST
| Capex total (greenfield) |
$348.10M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,160,338
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$1.71M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$5,696
Shown in table Reported / source value |
| Variable OPEX / MWh |
$0.00
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026
Notes
Project-specific greenfield capex not found. Site appears listed as publicly announced 300 MW battery at EIWA Gin Gin Renewable Energy Park Pty Ltd, but no reliable primary-source cost disclosure was located. The only quantified OPEX assumption used is the AEMO/Aurecon 2024 BESS benchmark fixed O&M for the 1-hour case; variable O&M is shown as nil in the benchmark. Because storage duration was unavailable, capex per MWh and any total project cost estimate were not derived.