Gnarwarre BESS Facility

BESS · FRV SA Pty Ltd · Storage - Battery

Development AEMO: Anticipated Other - Other NEM data · 381h
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.00/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Anticipated
Project status Development (AI)

Coordinates

DUID
Owner FRV SA Pty Ltd
Commissioned Jun 2027
Expected closure 2054
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM
Battery platform / chemistry
Inverter OEM
Inverter / PCS model
Stats window
01 Jun 2026 00:00 → 16 Jun 2026 20:50 AEST

Dispatch & revenue

01 Jun 2026 00:00 → 16 Jun 2026 20:50 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.00/MWh
Capex total (greenfield)
$1,229.51M

Shown in table
$1,229.51M (2026 real AUD)

Reported / source value
$1,200.00M (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Useful financing context, but not usable as plant capex.

Reference
White & Case advises Fotowatio Renewable Ventures (FRV) Australia on development and financing of Gnarwarre battery energy storage system (medium confidence)
Source recorded 08 Jun 2026

Capex refurbishment
Capex / MWh storage
Fixed OPEX (annual)
$1.85M

Shown in table
$1.85M (2026 real AUD)

Reported / source value
$1.75M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Annual fixed O&M derived by multiplying benchmark by site capacity.

Reference
2023 Cost and Technical Parameters Review Final Report (high confidence)
Source recorded 08 Jun 2026

Fixed OPEX / MW-yr
$7,384

Shown in table
$7.4k (2026 real AUD)

Reported / source value
$7.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Battery fixed O&M benchmark.

Reference
2023 Cost and Technical Parameters Review Final Report (high confidence)
Source recorded 08 Jun 2026

Variable OPEX / MWh
$0.00

Shown in table
$0.00 (2026 real AUD)

Reported / source value
$0.00 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Set to zero because report provides no variable O&M for BESS.

Reference
2023 Cost and Technical Parameters Review Final Report (high confidence)
Source recorded 08 Jun 2026

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: estimated · AI checked 08 Jun 2026

Notes
No plant-specific greenfield capex figure was found in owner, government, or project-finance sources. FRV/ARENA materials confirm a 250 MW / 500 MWh project and financial close, but do not state total project cost. In the absence of a reported project cost, battery capex was not back-filled with an AEMO benchmark. O&M and performance assumptions use AEMO GenCost / cost-parameter review battery defaults for a 200 MW Li-ion BESS scaled to 250 MW, with 20-year life and 84% round-trip efficiency. Variable O&M is treated as zero for large-scale BESS long-term service agreements in AEMO's review.

Sources