BESS · Enervest Pty Ltd · Storage - Battery
01 Jun 2026 00:00 → 14 Jun 2026 08:00 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
$369,198
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$25,000
Shown in table |
| Variable OPEX / MWh default |
$1.50
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026
Notes
No plant-specific greenfield capex announcement for Glenrowan BESS under Enervest was found in web search. Search results indicate the Glenrowan BESS is a proposed 400 MW / 1,600 MWh project by Akaysha Energy, while Enervest search results mostly relate to other battery projects. Because the requested site/owner pairing could not be verified, capex and operating assumptions remain unfilled pending a verified project-specific source. The Victoria government / infrastructure pipeline result provides project capacity and schedule context for a Glenrowan BESS, but not a cost figure.