15 Jun 2026 00:00 → 15 Jun 2026 01:55 AEST
| Capex total (greenfield) |
—
How this was derived |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
$369,198
Shown in table Reported / source value How this was derived |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$25,000
Shown in table |
| Variable OPEX / MWh default |
$1.50
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026
Notes
Project-specific greenfield capex was not found in owner/developer or government sources. Akaysha states Glenrowan BESS will be 400MW/1600MWh. AEMO/Aurecon 2024 battery benchmarks were identified for fallback only, but no plant-specific capex figure was available. No plant-specific O&M, fuel, or thermal-performance assumptions were found; battery fuel/heat rate are not applicable.