03 Jun 2026 22:20 → 04 Jun 2026 22:20 AEST
| Capex total (greenfield) |
—
How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
$369,198
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$25,000
Shown in table |
| Variable OPEX / MWh |
$0.00
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 04 Jun 2026
Notes
Project-specific capex/investment figure was not located in official owner, government, or finance announcements. Source documents confirm the project as a standalone BESS of up to 200 MW / 800 MWh at Glen Innes, with development approved on 18 Dec 2025. AEMO/CSIRO-style benchmark battery capex was not used because no plant-specific construction cost was found. Fixed O&M and efficiency were not directly sourced for this exact project; asset life defaulted from AEMO battery assumptions. The site name in the prompt is slightly inconsistent with planning documents, which refer to Glen Innes BESS at 464 Golf Links Road / 1 Wellingrove Street, Glen Innes.