BESS · Iberdrola Australia Development Pty Limited · Storage - Battery
14 Jun 2026 15:30 → 15 Jun 2026 15:30 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
$369,198
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$25,000
Shown in table |
| Variable OPEX / MWh default |
$1.50
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026
Notes
Project-specific capacity is confirmed as up to 500 MW, but no plant-specific greenfield capex announcement was found in the searched owner/government sources. Public Iberdrola documents confirm the project is proposed and under approval assessment, with a 2-4 hour duration in the factsheet, but they do not disclose MWh or total project investment. Internal server-side fallback values were not used because the requested capex could not be verified from a project-specific source, and the user instructed not to use AEMO benchmarks unless no project-specific figure exists. Because the MWh rating is not publicly stated in the sources reviewed, capex_per_mwh_aud cannot be derived.