Geranium Plains Solar and BESS

BESS · Risen Energy (Australia) Pty Ltd · Storage - Battery

Development AEMO: Publicly Announced Other - Other NEM data · 4h
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$1.50/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates

DUID
Owner Risen Energy (Australia) Pty Ltd
Commissioned
Expected closure
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM
Battery platform / chemistry
Inverter OEM
Inverter / PCS model
Stats window
15 Jun 2026 00:00 → 15 Jun 2026 04:00 AEST

Dispatch & revenue

15 Jun 2026 00:00 → 15 Jun 2026 04:00 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.50/MWh
Capex total (greenfield)
Capex refurbishment
Capex / MWh storage
$369,198

Shown in table
$369.2k (2026 real AUD)

Reported / source value
$350.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$25,000

Shown in table
$25.0k (2026 real AUD)

Variable OPEX / MWh default
$1.50

Shown in table
$1.50 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026

Notes
No project-specific greenfield capex announcement was found for Geranium Plains Solar and BESS in the searched official and reputable sources. AEMO documents confirm the project was proposed as 250 MW solar and 150 MW battery storage, but they do not provide capex. For battery operating assumptions, AEMO/Aurecon GenCost-style benchmark values for a hypothetical 200 MW Li-ion BESS were used as the closest available NEM reference: 4-hour BESS capex $313.3m total, fixed O&M $12,800/MW-yr, variable O&M nil, design life 20 years, and 1-2% EFOR with ~1.8% annual energy degradation. Because the site is a hybrid solar+BESS project and no project-specific battery duration or build cost was located, the capex fields remain unreported rather than estimated from benchmarks.

Sources