| Capex total (greenfield) |
—
How this was derived |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
$369,198
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$25,000
Shown in table |
| Variable OPEX / MWh default |
$1.50
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026
Notes
I could not verify a plant-specific greenfield capex, capacity (MW/MWh), or commissioning date for George Town BESS - KCI from authoritative sources in the available searches. Recurrent Energy sources confirm the company’s storage development capability, but I did not find a project page or announcement for this exact site. Because no project-specific cost was found, I did not apply AEMO/CSIRO benchmark capex. O&M and other operating assumptions were also not found for this exact asset, so left blank rather than impute benchmarks without a verified project match.