13 Jun 2026 05:05 → 14 Jun 2026 05:05 AEST
| Capex total (greenfield) |
—
How this was derived |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage default |
$350,000
Shown in table |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
$26,371
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$1.58
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: unknown · AI checked 07 Jun 2026
Notes
I could not verify a plant-specific project cost, capacity, commissioning date, or a reliable owner/developer source for 'Geelong BESS' under Elgin EnergyP/L from the web search results available. The retrieved results mostly related to other Geelong-area batteries (e.g., Victorian Big Battery, Little River BESS, Gnarwarre BESS) and did not identify this exact generator. Internal fallback O&M capex defaults were therefore used only as server-side placeholders where allowed, but capex_total_aud remains unset because no project-specific greenfield cost was found. Emissions intensity is set to zero for battery storage.