Wind · UPPER BURDEKIN WIND FARM PTY LTD · Wind Turbine - Onshore
01 Jun 2026 00:00 → 14 Jun 2026 14:40 AEST
| Capex total (greenfield) |
$1,229.51M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$3,013,500
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$22.99M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$56,352
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.51
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026
Notes
Project-specific source on the Gawara Baya site states a project value of $1.2 billion. This appears to be the most relevant plant-level greenfield investment figure found; capacity used for per-MW calculation is 408 MW from the user-provided generator details. No verified refurbishment cost found. O&M values fall back to server-side defaults because no plant-specific O&M source was found.