BESS · UPPER BURDEKIN WIND FARM PTY LTD · Storage - Battery
14 Jun 2026 05:15 → 15 Jun 2026 05:15 AEST
| Capex total (greenfield) |
$1,229.51M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage derived |
$5,911,097
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$2.66M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$25,615
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$1.54
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026
Notes
Plant-specific capex could not be found from the owner/developer directly, but a Queensland government-backed regional investment page lists Gawara Baya Wind Farm project value at $1.2 billion. The project is described as a 400 MW wind farm on the project website, while the DUID provided here is 104 MW battery storage; therefore the $1.2 billion figure appears to cover the broader wind project/precinct, not the battery DUID alone. I have used the provided fallback battery O&M defaults because no project-specific battery O&M data was found. Technology assumptions are for a grid-scale lithium-ion BESS; emissions, heat rate and fuel cost are not applicable.