Wind · UPPER BURDEKIN WIND FARM PTY LTD · Wind Turbine - Onshore
14 Jun 2026 00:00 → 14 Jun 2026 13:25 AEST
| Capex total (greenfield) |
—
How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$2,320,675
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
$58,017
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.53
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 06 Jun 2026
Notes
No plant-specific greenfield capex figure was found in owner/developer/government sources from the searches performed. The project is described by Windlab as a 400 MW onshore wind project; because no battery capacity/MWh was found in source material, storage-specific cost fields were left null. O&M defaults are used as fallback values.