Gawara Baya Wind And BESS (GBWF1)

Wind · UPPER BURDEKIN WIND FARM PTY LTD · Wind Turbine - Onshore

Development AEMO: Anticipated QLD1 Wind - Wind NEM data · 24 hours
—
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.53/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Anticipated
Project status Development (AI)

Region QLD1
Coordinates —

DUID GBWF1
Owner UPPER BURDEKIN WIND FARM PTY LTD
Commissioned Oct 2028
Expected closure 2053
Closure date —
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM —
Turbine model —
Stats window
25 Sep 2026 00:50 → 26 Sep 2026 00:50 AEST

Dispatch & revenue

25 Sep 2026 00:50 → 26 Sep 2026 00:50 AEST

No dispatch data for DUID GBWF1 in this period.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
—
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.53/MWh
Capex total (greenfield)
—

How this was derived
No plant-specific capital cost found on the project page.

Reference
Our projects | Windlab (low confidence)
Source recorded 06 Jun 2026

Capex refurbishment
—
Capex / MW
$2,320,675

Shown in table
$2.32M (2026 real AUD)

Reported / source value
$2.20M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
—
Fixed OPEX / MW-yr
$58,017

Shown in table
$58.0k (2026 real AUD)

Reported / source value
$55.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Used server-side fallback default as no plant-specific wind O&M source was found in the retrieved materials.

Variable OPEX / MWh
$0.53

Shown in table
$0.53 (2026 real AUD)

Reported / source value
$0.50 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Used server-side fallback default as no plant-specific wind variable O&M source was found in the retrieved materials.

Fuel cost / GJ
—
Heat rate GJ/MWh
—

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 06 Jun 2026

Notes
No plant-specific greenfield capex figure was found in owner/developer/government sources from the searches performed. The project is described by Windlab as a 400 MW onshore wind project; because no battery capacity/MWh was found in source material, storage-specific cost fields were left null. O&M defaults are used as fallback values.

Sources