21 Jun 2026 00:00 → 21 Jun 2026 23:59 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
$369,198
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$25,000
Shown in table |
| Variable OPEX / MWh default |
$1.50
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026
Notes
No plant-specific greenfield capex announcement was found in official ACEnergy / government / project documents. The project is described by ACEnergy and the NSW EPBC referral as approximately 400 MW / 1,760 MWh, under development, with construction expected 2026-2028 and an expected operational lifespan of up to 23 years. Because no verified project cost was located, capex and O&M are left null rather than using benchmark values. Emissions intensity set to zero for battery storage; fuel/heat-rate fields are not applicable.