BESS · Edify Energy Pty Ltd · Storage - Battery
13 Jun 2026 00:20 → 14 Jun 2026 00:20 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
$358,607
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
$25,615
Shown in table Reported / source value |
| Variable OPEX / MWh |
$1.54
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026
Notes
No plant-specific greenfield capex figure was found in official Edify or government sources. Public Edify materials confirm the Ganymirra project is in development and, together with Majors Creek, includes 300 MW of battery storage and 1,200 MWh of storage, with operational target in 2028. For operating assumptions, no project-specific O&M or performance figures were found, so server-side battery defaults are used for O&M; 35-year asset life is an indicative assumption for utility-scale battery storage and should be reviewed if a project-specific finance model is available.