Ganymirra Solar Power Station

BESS · Edify Energy Pty Ltd · Storage - Battery

Development AEMO: Publicly Announced Other - Other NEM data · 24 hours
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$1.54/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates

DUID
Owner Edify Energy Pty Ltd
Commissioned
Expected closure
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM
Battery platform / chemistry
Inverter OEM
Inverter / PCS model
Stats window
12 Jun 2026 22:35 → 13 Jun 2026 22:35 AEST

Dispatch & revenue

12 Jun 2026 22:35 → 13 Jun 2026 22:35 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.54/MWh
Capex total (greenfield)
Capex refurbishment
Capex / MWh storage
$358,607

Shown in table
$358.6k (2026 real AUD)

Reported / source value
$350.0k (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr
$25,615

Shown in table
$25.6k (2026 real AUD)

Reported / source value
$25.0k (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Variable OPEX / MWh
$1.54

Shown in table
$1.54 (2026 real AUD)

Reported / source value
$1.50 (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026

Notes
No plant-specific greenfield capex figure was found in official Edify or government sources. Public Edify materials confirm the Ganymirra project is in development and, together with Majors Creek, includes 300 MW of battery storage and 1,200 MWh of storage, with operational target in 2028. For operating assumptions, no project-specific O&M or performance figures were found, so server-side battery defaults are used for O&M; 35-year asset life is an indicative assumption for utility-scale battery storage and should be reviewed if a project-specific finance model is available.

Sources