Fulham Solar Farm

BESS · Fulham Solar Farm Pty Ltd (ATF Fulham Solar Farm Trust) · Storage - Battery

AEMO: removed Solar - Solar NEM data · 513h
64/128 MW
Registered nameplate capacity / storage
Est. SRMC
$0.20/MWh
Key information
Capacity
64 MW / 128 MWh

AEMO status removed
Project status (AI)

Coordinates

DUID
Owner Fulham Solar Farm Pty Ltd (ATF Fulham Solar Farm Trust)
Commissioned Dec 2027
Expected closure
Closure date
Technology Storage - Battery
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
01 Jun 2026 00:00 → 22 Jun 2026 08:30 AEST

Dispatch & revenue

01 Jun 2026 00:00 → 22 Jun 2026 08:30 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
64 MW / 128 MWh
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.20/MWh
Capex total (greenfield)
$307.38M

Shown in table
$307.38M (2026 real AUD)

Reported / source value
$300.00M (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Plant-specific greenfield project cost announcement used as reported capex.

Reference
Fulham solar farm and battery offer bright renewables future for Latrobe Valley (high confidence)
Source recorded 07 Jun 2026

Capex refurbishment
Capex / MWh storage derived
$2,401,383

Shown in table
$2.40M (2026 real AUD)

Reported / source value
$2.34M (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Derived per-MWh capex based on project cost and 128 MWh battery storage disclosed in source.

Reference
Fulham solar farm and battery offer bright renewables future for Latrobe Valley (high confidence)
Source recorded 07 Jun 2026

Fixed OPEX (annual)
$1.18M

Shown in table
$1.18M (2026 real AUD)

Reported / source value
$1.08M (2025 nominal)
Table total may differ if recalculated from $/MW × registered capacity after CPI adjustment.

How this was derived
Fallback annual fixed O&M carried through from the provided internal default; should be reviewed because the plant is hybrid and the user-provided capacity differs from source-disclosed 80 MW solar.

Fixed OPEX / MW-yr
$18,443

Shown in table
$18.4k (2026 real AUD)

Reported / source value
$18.0k (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Server-side fallback used because no plant-specific O&M disclosure was found.

Variable OPEX / MWh
$0.20

Shown in table
$0.20 (2026 real AUD)

Reported / source value
$0.20 (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Server-side fallback used because no plant-specific variable O&M disclosure was found.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026

Notes
Project announcement and CEFC case study indicate the Fulham Solar Farm and 128 MWh battery reached financial close and commenced construction in April 2025 at approximately A$300 million total project cost. Site materials also describe the project as an 80 MW solar farm with up to 128 MWh battery storage and expected operation in 2027. Fixed O&M, variable O&M, asset life and discount rate are defaults/fallback estimates rather than plant-specific disclosed values. The site is a DC-coupled solar-battery hybrid, so battery normalisation is used for the financial profile rather than pure solar.