BESS · Fulham Solar Farm Pty Ltd (ATF Fulham Solar Farm Trust) · Storage - Battery
15 Jun 2026 08:30 → 22 Jun 2026 08:30 AEST
| Capex total (greenfield) |
$307.38M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage derived |
$2,401,383
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$1.18M
Shown in table Reported / source value How this was derived |
| Fixed OPEX / MW-yr |
$18,443
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.20
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026
Notes
Project announcement and CEFC case study indicate the Fulham Solar Farm and 128 MWh battery reached financial close and commenced construction in April 2025 at approximately A$300 million total project cost. Site materials also describe the project as an 80 MW solar farm with up to 128 MWh battery storage and expected operation in 2027. Fixed O&M, variable O&M, asset life and discount rate are defaults/fallback estimates rather than plant-specific disclosed values. The site is a DC-coupled solar-battery hybrid, so battery normalisation is used for the financial profile rather than pure solar.