Fulham Solar Farm

Solar · Fulham Solar Farm Pty Ltd (ATF Fulham Solar Farm Trust) · Solar PV - Single axis tracking

AEMO: removed Solar - Solar NEM data · 24 hours
101 MW
Registered nameplate capacity
Est. SRMC
$0.26/MWh
Key information
Capacity
101 MW

AEMO status removed
Project status (AI)

Coordinates

DUID
Owner Fulham Solar Farm Pty Ltd (ATF Fulham Solar Farm Trust)
Commissioned Dec 2027
Expected closure
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
14 Jun 2026 01:35 → 15 Jun 2026 01:35 AEST

Dispatch & revenue

14 Jun 2026 01:35 → 15 Jun 2026 01:35 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
101 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.26/MWh
Capex total (greenfield)
$307.38M

Shown in table
$307.38M (2026 real AUD)

Reported / source value
$300.00M (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Reported project investment for the Fulham Solar Farm and Battery hybrid project.

Reference
Octopus Australia begins construction of its Fulham Solar Farm and Battery Project (high confidence)
Source recorded 07 Jun 2026

Capex refurbishment
Capex / MW derived
$3,049,375

Shown in table
$3.05M (2026 real AUD)

Reported / source value
$2.98M (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$20,000

Shown in table
$20.0k (2026 real AUD)

Variable OPEX / MWh
$0.26

Shown in table
$0.26 (2026 real AUD)

Reported / source value
$0.25 (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026

Notes
Plant-specific capex was not available from the owner for the solar-only portion at the registered 100.8 MW capacity. The best available reported figure found was Octopus Australia/CEFC reporting the Fulham Solar Farm and Battery project at 'over $300m' for an 80 MW solar + 64 MW/128 MWh battery project. Because this is a hybrid project and the solar-only capacity in the prompt differs from the cited project capacity, capex should be treated as an approximate project-level reported value rather than a fully matched DUID-specific construction cost. Fixed O&M was not reliably found from a plant-specific or authoritative benchmark source during this search, so it is left null instead of using a generic fallback.