BESS · Forbes Solar Farm Pty Ltd ATF Forbes Genesis Project Trust · Storage - Battery
12 Jun 2026 23:45 → 13 Jun 2026 23:45 AEST
| Capex total (greenfield) |
$31.65M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
—
|
| Fixed OPEX (annual) |
$3.16M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$26,371
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$1.58
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026
Notes
Project-specific public information found for the Forbes Solar Farm and BESS indicates a capital investment value of more than $30 million, but the project is still in EIS stage and not yet fully approved/constructed. Capacity in planning documents is 166 MW solar farm with 120 MW / 960 MWh BESS; the user-provided owner/technology label is treated as the battery component. Fixed O&M falls back to internal default because no project-specific BESS O&M figure was found. If the $30 million figure is intended to describe the full solar-plus-storage precinct rather than the battery-only component, the battery-only capex would be materially overstated here.