Forbes Solar Farm & BESS

BESS · Forbes Solar Farm Pty Ltd ATF Forbes Genesis Project Trust · Storage - Battery

Development AEMO: Publicly Announced Other - Other NEM data · 24 hours
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$1.58/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates

DUID
Owner Forbes Solar Farm Pty Ltd ATF Forbes Genesis Project Trust
Commissioned
Expected closure 2062
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM
Battery platform / chemistry
Inverter OEM
Inverter / PCS model
Stats window
12 Jun 2026 23:45 → 13 Jun 2026 23:45 AEST

Dispatch & revenue

12 Jun 2026 23:45 → 13 Jun 2026 23:45 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.58/MWh
Capex total (greenfield)
$31.65M

Shown in table
$31.65M (2026 real AUD)

Reported / source value
$30.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Official project website gives a project capital investment value of more than $30 million.

Reference
The Project — Forbes Solar Farm (high confidence)
Source recorded 07 Jun 2026

Capex refurbishment
Capex / MWh storage
Fixed OPEX (annual)
$3.16M

Shown in table
$3.16M (2026 real AUD)

Reported / source value
$3.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$26,371

Shown in table
$26.4k (2026 real AUD)

Reported / source value
$25.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No project-specific fixed O&M figure was found; server-side default used.

Variable OPEX / MWh
$1.58

Shown in table
$1.58 (2026 real AUD)

Reported / source value
$1.50 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No project-specific variable O&M figure was found; server-side default used.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026

Notes
Project-specific public information found for the Forbes Solar Farm and BESS indicates a capital investment value of more than $30 million, but the project is still in EIS stage and not yet fully approved/constructed. Capacity in planning documents is 166 MW solar farm with 120 MW / 960 MWh BESS; the user-provided owner/technology label is treated as the battery component. Fixed O&M falls back to internal default because no project-specific BESS O&M figure was found. If the $30 million figure is intended to describe the full solar-plus-storage precinct rather than the battery-only component, the battery-only capex would be materially overstated here.

Sources