Wind · Ferguson Wind Farm Pty Ltd · Wind Turbine - Onshore
15 Jun 2026 22:10 → 16 Jun 2026 22:10 AEST
| Capex total (greenfield) |
$27.85M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$2,320,675
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$55,000
Shown in table |
| Variable OPEX / MWh default |
$0.50
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026
Notes
Plant-specific greenfield capex was not found in the searched official owner/government sources. The available official sources confirm the project was commissioned in April 2021 and is a 3-turbine wind farm; capacity is reported as 12.0 MW on the owner's current project page, while an older technical source describes 10.8 MW. Because no project-specific investment figure was located, capex is left null rather than substituting a benchmark. O&M and life assumptions were also not located in source-backed form and are left null.