BESS · Everleigh Solar Park Pty Ltd · Storage - Battery
13 Jun 2026 08:00 → 14 Jun 2026 08:00 AEST
| Capex total (greenfield) |
—
How this was derived |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
$358,607
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
$5,533
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh default |
$1.50
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 04 Jun 2026
Notes
No plant-specific greenfield capex figure was found in the available search results for Everleigh Solar Farm & BESS - KCI. The project website confirms the project exists but does not publish investment cost. Fallback battery O&M and performance parameters were taken from the AEMO/Aurecon 2024 Energy Technology Cost and Technical Parameter Review for a 200 MW co-located BESS; these are indicative benchmark values, not project-specific. Battery life of 25 years and 84% round-trip efficiency are from the same AEMO/Aurecon source.