Everleigh Solar Farm & BESS - KCI

BESS · Everleigh Solar Park Pty Ltd · Storage - Battery

Development AEMO: Publicly Announced Other - Other NEM data · 24 hours
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$1.50/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates

DUID
Owner Everleigh Solar Park Pty Ltd
Commissioned
Expected closure
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM
Battery platform / chemistry
Inverter OEM
Inverter / PCS model
Stats window
13 Jun 2026 08:00 → 14 Jun 2026 08:00 AEST

Dispatch & revenue

13 Jun 2026 08:00 → 14 Jun 2026 08:00 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.50/MWh
Capex total (greenfield)

How this was derived
No project-specific greenfield construction/investment cost was located in the available sources.

Capex refurbishment
Capex / MWh storage
$358,607

Shown in table
$358.6k (2026 real AUD)

Reported / source value
$350.0k (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr
$5,533

Shown in table
$5.5k (2026 real AUD)

Reported / source value
$5.4k (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Indicative fixed O&M benchmark for a 200 MW co-located BESS, with 5,400 used here as the base benchmark.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 04 Jun 2026

Variable OPEX / MWh default
$1.50

Shown in table
$1.50 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 04 Jun 2026

Notes
No plant-specific greenfield capex figure was found in the available search results for Everleigh Solar Farm & BESS - KCI. The project website confirms the project exists but does not publish investment cost. Fallback battery O&M and performance parameters were taken from the AEMO/Aurecon 2024 Energy Technology Cost and Technical Parameter Review for a 200 MW co-located BESS; these are indicative benchmark values, not project-specific. Battery life of 25 years and 84% round-trip efficiency are from the same AEMO/Aurecon source.