01 Jun 2026 00:00 → 14 Jun 2026 08:00 AEST
| Capex total (greenfield) |
$409.84M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
—
How this was derived Reference |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$25,000
Shown in table |
| Variable OPEX / MWh |
$1.54
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026
Notes
Project is under development. Potentia Energy states the 225 MW / 900 MWh Emeroo BESS has an estimated investment value of more than $400 million, with construction targeted to start in 2026 and operations in 2028. Capex per MW and per MWh are calculated from the reported total and nameplate capacity. No plant-specific O&M benchmark was found in the available sources, so O&M remains on fallback defaults only where the schema requires server-side use; not populated here because only source-backed values were requested.