Elaine Solar Farm & BESS Hybrid

BESS · Elgin Energy Pty Ltd · Storage - Battery

Development AEMO: Publicly Announced Other - Other NEM data · 24 hours
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$1.54/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates

DUID
Owner Elgin Energy Pty Ltd
Commissioned
Expected closure
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM
Battery platform / chemistry
Inverter OEM
Inverter / PCS model
Stats window
14 Jun 2026 13:05 → 15 Jun 2026 13:05 AEST

Dispatch & revenue

14 Jun 2026 13:05 → 15 Jun 2026 13:05 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.54/MWh
Capex total (greenfield)
$460.00M

Shown in table
$460.00M (2026 real AUD)

Reported / source value
$460.00M (2026 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Official company announcement of A$460 million project finance facility for Elaine BESS construction.

Reference
Akaysha closes A$460m construction financing and commences construction on Elaine BESS (high confidence)
Source recorded 04 Jun 2026

Capex refurbishment
Capex / MWh storage

How this was derived
Derived per-MWh capex using the reported A$460 million and project size disclosed in secondary reporting and project materials.

Reference
Akaysha closes A$460m construction financing and commences construction on Elaine BESS (medium confidence)
Source recorded 04 Jun 2026

Fixed OPEX (annual)
Fixed OPEX / MW-yr
$25,615

Shown in table
$25.6k (2026 real AUD)

Reported / source value
$25.0k (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No separate source-backed fixed O&M could be verified from the searched materials.

Variable OPEX / MWh
$1.54

Shown in table
$1.54 (2026 real AUD)

Reported / source value
$1.50 (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No separate source-backed variable O&M could be verified from the searched materials.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 04 Jun 2026

Notes
Project-specific reported figure found for Elaine BESS financing/construction: A$460 million. The available sources identify this as the Elaine BESS project in Victoria and construction financing; the hybrid solar-farm-plus-BESS site description in user prompt appears to refer to the same Elaine project cluster. No plant-specific solar-plus-storage total EPC cost split was found in the searched sources, so the battery project financing figure is used as the best available reported capex proxy for the battery component. Asset life set to 15 years based on the financing/source context for the Elaine BESS. Fixed O&M was not separately sourced and thus left null rather than inferred from the fallback server default.