BESS · Elai Energy Pty Ltd · Storage - Battery
15 May 2026 05:15 → 14 Jun 2026 05:15 AEST
| Capex total (greenfield) |
—
How this was derived |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage default |
$350,000
Shown in table |
| Fixed OPEX (annual) |
$3.16M
Shown in table Reported / source value How this was derived |
| Fixed OPEX / MW-yr |
$26,371
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$1.58
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: unknown · AI checked 07 Jun 2026
Notes
No plant-specific greenfield capex announcement or project finance figure was found for this battery project in owner/developer or government sources. The project is listed by NEMStats as publicly announced with 120 MW capacity and no commissioning date shown. Internal server-side defaults were used for capex, fixed OPEX, and variable OPEX; fixed OPEX was annualised from the default $25,000/MW-year × 120 MW. Battery storage has zero direct fuel cost and zero direct operational emissions. AEMO/CSIRO benchmark documents were located, but not used for capex because no project-specific investment figure was found and the user instructed not to rely on benchmarks unless necessary; however, the exact benchmark inputs were not extracted here.