Elai Genesis Battery Storage System

BESS · Elai Energy Pty Ltd · Storage - Battery

Development AEMO: Publicly Announced Other - Other NEM data · 30 days
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$1.58/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates

DUID
Owner Elai Energy Pty Ltd
Commissioned
Expected closure
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM
Battery platform / chemistry
Inverter OEM
Inverter / PCS model
Stats window
15 May 2026 05:15 → 14 Jun 2026 05:15 AEST

Dispatch & revenue

15 May 2026 05:15 → 14 Jun 2026 05:15 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.58/MWh
Capex total (greenfield)

How this was derived
No project-specific greenfield capex figure found in searched owner/developer, government, or finance sources.

Capex refurbishment
Capex / MWh storage default
$350,000

Shown in table
$350.0k (2026 real AUD)

Fixed OPEX (annual)
$3.16M

Shown in table
$3.16M (2026 real AUD)

Reported / source value
$3.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Annual fixed OPEX was calculated from the default per-MW value and the 120 MW capacity from NEMStats.

Fixed OPEX / MW-yr
$26,371

Shown in table
$26.4k (2026 real AUD)

Reported / source value
$25.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Default fixed OPEX per MW-year supplied by user instructions was used.

Variable OPEX / MWh
$1.58

Shown in table
$1.58 (2026 real AUD)

Reported / source value
$1.50 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Default variable OPEX supplied by user instructions was used.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: low · Status: ai estimated · Capex basis: unknown · AI checked 07 Jun 2026

Notes
No plant-specific greenfield capex announcement or project finance figure was found for this battery project in owner/developer or government sources. The project is listed by NEMStats as publicly announced with 120 MW capacity and no commissioning date shown. Internal server-side defaults were used for capex, fixed OPEX, and variable OPEX; fixed OPEX was annualised from the default $25,000/MW-year × 120 MW. Battery storage has zero direct fuel cost and zero direct operational emissions. AEMO/CSIRO benchmark documents were located, but not used for capex because no project-specific investment figure was found and the user instructed not to rely on benchmarks unless necessary; however, the exact benchmark inputs were not extracted here.

Sources