Edenvale Solar Park (EDENVSF1)

Solar · Edenvale Solar Park Pty Ltd · Solar PV - Single axis tracking

Operational AEMO: In Service QLD1 Solar - Solar NEM data · 580h
180 MW
Registered nameplate capacity
580h revenue
$398.9k
Capacity factor
28.4%
Revenue / MWh
$13.43
Est. SRMC
$0.00/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.

Key information
Capacity
180 MW

AEMO status In Service
Project status Operational (AI)

Edenvale Solar Park website, 2024-03-01 COD announcement; pv magazine Australia, 2023-10-03, reports the 204 MW project reached rated output and was opened.

Region QLD1
Coordinates -26.93200, 150.58190 (AI)

Global Energy Monitor / Queensland electricity generation map coordinates for Edenvale Solar Park (exact site).

MLF 0.9797
DUID EDENVSF1
Owner Edenvale Solar Park Pty Ltd
Commissioned Mar 2024
Expected closure 2053
Closure date —
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM Gransolar
Module / inverter supplier module/inverter supplier
Inverter OEM —
Inverter model —
Equipment confidence medium
Stats window
01 Sep 2026 00:00 → 25 Sep 2026 04:05 AEST

Dispatch & revenue

01 Sep 2026 00:00 → 25 Sep 2026 04:05 AEST

Energy revenue (× MLF)
$398.9k
FCAS revenue (× MLF)
$0
FCAS volume
— MWh
Dispatched
29,700.9 MWh
Available
29,403.9 MWh
Curtailed
620.8 MWh
Curtailment
2.1%
of available
MLF used
0.9797
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional price — dispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • State of charge — INITIAL_ENERGY_STORAGE (MWh at interval start) from UNIT_SOLUTION, published for bidirectional/storage units. Next-day data — the SOC line lags real time by up to a day.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9707
2025-07-01 0.9823
2026-07-01 0.9797

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
180 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.00/MWh
Capex total (greenfield)
$211.44M

Shown in table
$211.44M (2026 real AUD)

Reported / source value
$170.00M (2021 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Council report lists Edenvale Solar Park as a 204 MW solar farm with $170 million construction cost.

Reference
Western Downs Development Status Report 2024 (high confidence)
Source recorded 07 Jun 2026

Capex refurbishment
—
Capex / MW derived
$1,174,682

Shown in table
$1.17M (2026 real AUD)

Reported / source value
$944.4k (2021 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Per-MW capex is calculated from the reported project construction cost and capacity.

Reference
Western Downs Development Status Report 2024 (high confidence)
Source recorded 07 Jun 2026

Fixed OPEX (annual)
$2.28M

Shown in table
$2.28M (2026 real AUD)

Reported / source value
$2.45M (2024 nominal)
Table total may differ if recalculated from $/MW × registered capacity after CPI adjustment.

How this was derived
Annual fixed O&M is scaled from the benchmark using plant capacity.

Reference
2024 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 07 Jun 2026

Fixed OPEX / MW-yr
$12,658

Shown in table
$12.7k (2026 real AUD)

Reported / source value
$12.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
AEMO/Aurecon benchmark provides utility-scale solar PV fixed O&M.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 07 Jun 2026

Variable OPEX / MWh
$0.00

Shown in table
$0.00 (2026 real AUD)

Reported / source value
$0.00 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
AEMO/Aurecon indicates no separate variable O&M for utility-scale solar PV.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 07 Jun 2026

Fuel cost / GJ
—
Heat rate GJ/MWh
—

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026

Notes
Plant-specific construction cost found in a Queensland government development status report: $170 million construction cost for Edenvale Solar Park (204 MW). The project owner/developer pages confirm the asset is a 204 MW solar farm and that it uses single-axis tracking; O&M benchmark taken from AEMO/Aurecon 2024 review for utility-scale solar PV. Construction commenced in 2021 and commercial operation was announced in 2023, so capex_year is set to 2021 as the construction start year in the source trail. No refurbishment cost identified. Emissions intensity is zero for solar PV. Asset life uses the AEMO/Aurecon utility-scale solar PV indicative technical life.

Sources