07 Jun 2026 06:20 → 14 Jun 2026 06:20 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
$369,198
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
$8,439
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$0.00
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026
Notes
No plant-specific greenfield capex announcement was found for Doreen BESS or BZ Renewables Holdings Pty Ltd in the searched sources, so no reported project cost could be verified. Used AEMO/Aurecon 2024 battery O&M reference input as fallback for fixed O&M per MW-year. Battery projects in Aurecon's review are increasingly assumed to have ~25-year operational lifetime.