14 Jun 2026 00:00 → 14 Jun 2026 16:45 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
$369,198
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$25,000
Shown in table |
| Variable OPEX / MWh default |
$1.50
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026
Notes
No plant-specific battery-only greenfield capex was found for the Dinawan Energy Hub battery component. The best project-specific public figure found is for the wider Dinawan solar-and-battery project: AUD 1.35 billion for 800 MW solar plus 356 MW / 1,574 MWh battery storage, approved in April 2026. Because that figure covers a combined solar-storage package rather than the battery asset alone, it was not used as capex_total_aud for this battery generator. Project sources indicate the Dinawan Energy Hub includes 300 MW / 1,200 MWh battery storage as part of the broader hub, but no separate battery capex was disclosed. Battery O&M and other operating assumptions were not publicly disclosed in the project sources and would require benchmark-based estimation if needed.