Dinawan Energy Hub

BESS · Spark Renewables Pty Ltd · Storage - Battery

Development AEMO: Publicly Announced Other - Other NEM data · 24 hours
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$1.50/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Spark Renewables project listing / public announcement for Dinawan Energy Hub (site described as announced, not yet built).

Coordinates

DUID
Owner Spark Renewables Pty Ltd
Commissioned Mar 2031
Expected closure 2050
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM
Battery platform / chemistry
Inverter OEM
Inverter / PCS model
Stats window
13 Jun 2026 12:05 → 14 Jun 2026 12:05 AEST

Dispatch & revenue

13 Jun 2026 12:05 → 14 Jun 2026 12:05 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.50/MWh
Capex total (greenfield)
Capex refurbishment
Capex / MWh storage
$369,198

Shown in table
$369.2k (2026 real AUD)

Reported / source value
$350.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$25,000

Shown in table
$25.0k (2026 real AUD)

Variable OPEX / MWh default
$1.50

Shown in table
$1.50 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026

Notes
No plant-specific battery-only greenfield capex was found for the Dinawan Energy Hub battery component. The best project-specific public figure found is for the wider Dinawan solar-and-battery project: AUD 1.35 billion for 800 MW solar plus 356 MW / 1,574 MWh battery storage, approved in April 2026. Because that figure covers a combined solar-storage package rather than the battery asset alone, it was not used as capex_total_aud for this battery generator. Project sources indicate the Dinawan Energy Hub includes 300 MW / 1,200 MWh battery storage as part of the broader hub, but no separate battery capex was disclosed. Battery O&M and other operating assumptions were not publicly disclosed in the project sources and would require benchmark-based estimation if needed.